• pl
  • en
  • 08.06.2020 | FNEZ

    It summarises the results of extensive PreFeasibility Studies performed for 2 cases – an electrical connection between Poland, Sweden and Lithuania integrated with planned offshore wind farms in these countries and an analogical connection between Sweden, Germany.
    The results include analysis of technical, spatial and environmental conditions as well as cost-benefit analysis of zero, partial and maximum integration of offshore wind farms with interconnectors.

    Copyright © 2020 FNEZ | All rights reserved| Privacy policy | Implementation: Bazinga

    This site uses cookies. Learn more.

    X